Written By: Rourke Blignaut
Date Written: 11/1/25
Work is being done to Fletcher cove. The ramp that leads to the beach is being renovated with changes including a new shower area at the bottom of the ramp, additional shower heads for post-beach cleanups, an upgraded storm drain dissipater grate, and a new access ramp with an improved walkway and handrailing. Now if you remember, the access ramp from before was very steep and the railing was rusted away. The project is expected to be done by December.