Date Written: 2/17/26
Written By: Rourke Blignaut
The beach access renovations at Fletcher Cove have now been completed. The renovation added showers at the bottom of the ramp, new railing, and a new storm drain dissipator grate. The renovations originally started in October. These renovations have been long needed due to the steepness of the ramp leading to the beach that acted as a risk to beachgoers. The renovations have not changed the steepness of the ramp but did replace the concrete.